Projects in progress

Client Details Of Work Completed Project Site Status
Fabrication, erection of fire protection system with 6G welding 200 PSI pressure , the ranging of pipe from 15MM to 450MM our part of works about 45km the Consultats M/s CUSHMAN & WAKEFIELD
M/s GECIS Uppal, Hyderabad, India
Completed 2002-2003
Fabrication/Erection Steel Structurals and Heavy Crane Girders, Steel special MS Doors supporting structural paintings,
Nagarjuna Sagar Site, Defence Project India
Completed 2002
Erection testing and commissioning of Turbo generator sets, Turbo Blower seta and its auxiliaries with H.P and L.P Pipings
Jaipur, Orissa, India
Completed by 2000
Erection . Testing and commissioning of most modern sugar plant having high pressure Boilers (40t of 45 kg/Cm2 and 6MW Turbo Generators complete pipings approx 21km ranging from 15 NB to 1800 NB
M/s SSK Ltd , Athani , India
in the year 1999-2000
Fabrication, erection SS 316 Distillation columns total unit and its pipings , SS Reactor 12 units, Designs, Fabrication/Erection and commissioning , Boilers , Vet-Scrubber for controlling (PPM) Pollution.
M/s B.E. Ltd, Hyderabd, India
Ccompleted 1999-2000
Fabrictaionand erection complete unit at site including piping and painting for the waste water treatment plant, consultant, W.S Atkins India PVT Ltd
M/s Indian school of business, Hyderabda, India
Completed 1999- 2000
The Turnkey Sugar plant Dismantling and re-Erection including Sheeting from Hindupur (AP) to Re-erect at Manoli, Karnataka
M/s Renuka Sugars Ltd, Belgaum, India
Completed 1998-1999
Fabrication /erection of Dish bottomed storage tanks , 20 KL Cap SS 304 6 nos and its connected pumps, piping with Tig welding and mirror finish polishing
M/s Medak Milk Shed Nizamabad, India
Completed 1998-1999
Coca -Cola plant mechanical works like equipments , large dia storage tanks, fabrication and erection at site including SS pipig works and paintings.
M/s Vijayawda plant and Bollaram site , Hydrebad Bottling Co.Ltd;
Completed 1996-98
Erection of 2 nos 35 Ton Boilers all onnected equipments, structures total pipings.
Medak Dist, Andhra Pradesh, India
Completes 1996-97
Erection and commissioning of 2 nos 35kg. Cm 2 g Boilers , its connected high pressure pipings /exhaust line, condensating storage tanks , high pressure pumps etc;
Chittoor Dist., Andhra Pradesh , India
Completed 1995-96
Supply Fabrication & Erection of SS304 Jobs like steam Jacketed tanjks with stirrer and it drives SS 316 piping, 22 Nos, 304 containers with trolleys, SS316 piping about 20,000 Meters, SS mirror finishing works and paintings
Parke-Davis (I) Ltd, Uppal, Hyderabad India
Completed 1994-95
Supply and Erection of Jacketted type SS Tanks, and SS piping pumps, Plant maintenance Etc.
M/s. Epsi Industries, Hyderabad, India
Completed 1991-92
Renovation of boilers pressure parts work at 210 MW
Gujarat, UKAI, India
Completed by 1990
Fabrication/Erection of Conveyors, dust catchers, total 32 no's for SINTER PLANT ZONE
M/s. Vishakhapatnam Steel Project
Completed 1989-90
Fabrication/Erection of C.W. System Balco Captive power plant, the MS pipe size 800mm Dia to 1800mm dia, Weigth 800MT, under NTPC and NPCC Supervision
M/s. Balco Captice Power Plant 120x4 MW at Korba (MP) India
Completed 1985-87
Fabrication/Erection of pipe Rack Supporting Steel structural with X-Ray quality welding 20% Randum, under EIL supervision total 800MT
M/s. KRC Works Heavy Water Project, Manuguru (AP) India
Completed 1984-85
Structural Stagging Fabrication for Boiling House Equipments, for Hidupur unit 200MT, and Sugar Godown, Roof structural Fabrication and Erection 200MT, Crane Gantry Columns for main factory at Hidupur Unit 250MT, Boiling House Equipment, Erection and Commissioning at Hidupur, 700MT
M/s. Nizam Sugar Factory Ltd. Under Govt. of India
Completed 1984-85
Fabrication at NSF Workshop and Transporting various projects site and Erection testing & commissioning 7 nos of Molasses Storage Tanks as per the relevant Indian Standard
For various site (AP) State, India
Completed 1980-85
Fabrication/Erection Steel Structurals for main Factory Building and Sugar Godown Roof Trusses with Sheeting.
M/s. Nagarjuna Co-operative Sugar Factory, Guntur Dist. India
Completed 1984-85
Erection of complete Boiling House Equipments with sSite Fabrications about 250MT.
M/s. Thandava Co-operative Sugars Ltd, Visakhapatnam (AP) India
Completed 1980-81
Fabrication/Erection of EOT and HOT Cranes Gantry to fabricate with MS Plate Including Rail fixing
M/s. NSF Miriyalguda (AP) India
Completed 1976-77
The complete Boiling House Equipment Erection and Co-generation supplied by Jyothi Ltd; 4.5 MW Baroda, turbineM/s. Willis Morcome Calcutta, Including H.P. and L.P. pipings Steam Line and Processes piping
M/s. Nandyal Co-Operative Sugars Ltd., (AP) India
Completed 1976-77
Fabrication/Erection of Hevay Structurals for NSF, Miriyalguda Total weight: 800MT
M/s. NSF Miriyalguda (AP) India
Completed 1975-76