Fabrication, Erection of penstock Liners Dia Mtr 4250MM TK 22MM for hydro 3x14MW, 900 Ton
Fabrication/ Ercetion of General A/C Pipings ranging 50MM to 350MM NB and connected equipment erection
Fabrication & Erection RO Piping SS316 Rnaging form 12MM to 100MM with complete Argon (TIG) welding..
Client | Details Of Work Completed | Project Site | Status |
---|---|---|---|
Fabrication, erection of fire protection system with 6G welding 200 PSI pressure , the ranging of pipe from 15MM to 450MM our part of works about 45km the Consultats M/s CUSHMAN & WAKEFIELD |
M/s GECIS Uppal, Hyderabad, India |
Completed 2002-2003 |
|
Fabrication/Erection Steel Structurals and Heavy Crane Girders, Steel special MS Doors supporting structural paintings, |
Nagarjuna Sagar Site, Defence Project India |
Completed 2002 |
|
Erection testing and commissioning of Turbo generator sets, Turbo Blower seta and its auxiliaries with H.P and L.P Pipings |
Jaipur, Orissa, India |
Completed by 2000 |
|
Erection . Testing and commissioning of most modern sugar plant having high pressure Boilers (40t of 45 kg/Cm2 and 6MW Turbo Generators complete pipings approx 21km ranging from 15 NB to 1800 NB |
M/s SSK Ltd , Athani , India |
in the year 1999-2000 |
|
Fabrication, erection SS 316 Distillation columns total unit and its pipings , SS Reactor 12 units, Designs, Fabrication/Erection and commissioning , Boilers , Vet-Scrubber for controlling (PPM) Pollution. |
M/s B.E. Ltd, Hyderabd, India |
Ccompleted 1999-2000 |
|
Fabrictaionand erection complete unit at site including piping and painting for the waste water treatment plant, consultant, W.S Atkins India PVT Ltd |
M/s Indian school of business, Hyderabda, India |
Completed 1999- 2000 |
|
The Turnkey Sugar plant Dismantling and re-Erection including Sheeting from Hindupur (AP) to Re-erect at Manoli, Karnataka |
M/s Renuka Sugars Ltd, Belgaum, India |
Completed 1998-1999 |
|
Fabrication /erection of Dish bottomed storage tanks , 20 KL Cap SS 304 6 nos and its connected pumps, piping with Tig welding and mirror finish polishing |
M/s Medak Milk Shed Nizamabad, India |
Completed 1998-1999 |
|
Coca -Cola plant mechanical works like equipments , large dia storage tanks, fabrication and erection at site including SS pipig works and paintings. |
M/s Vijayawda plant and Bollaram site , Hydrebad Bottling Co.Ltd; |
Completed 1996-98 |
|
Erection of 2 nos 35 Ton Boilers all onnected equipments, structures total pipings. |
Medak Dist, Andhra Pradesh, India |
Completes 1996-97 |
|
Erection and commissioning of 2 nos 35kg. Cm 2 g Boilers , its connected high pressure pipings /exhaust line, condensating storage tanks , high pressure pumps etc; |
Chittoor Dist., Andhra Pradesh , India |
Completed 1995-96 |
|
Supply Fabrication & Erection of SS304 Jobs like steam Jacketed tanjks with stirrer and it drives SS 316 piping, 22 Nos, 304 containers with trolleys, SS316 piping about 20,000 Meters, SS mirror finishing works and paintings |
Parke-Davis (I) Ltd, Uppal, Hyderabad India |
Completed 1994-95 |
|
Supply and Erection of Jacketted type SS Tanks, and SS piping pumps, Plant maintenance Etc. |
M/s. Epsi Industries, Hyderabad, India |
Completed 1991-92 |
|
Renovation of boilers pressure parts work at 210 MW |
Gujarat, UKAI, India |
Completed by 1990 |
|
Fabrication/Erection of Conveyors, dust catchers, total 32 no's for SINTER PLANT ZONE |
M/s. Vishakhapatnam Steel Project |
Completed 1989-90 |
|
Fabrication/Erection of C.W. System Balco Captive power plant, the MS pipe size 800mm Dia to 1800mm dia, Weigth 800MT, under NTPC and NPCC Supervision |
M/s. Balco Captice Power Plant 120x4 MW at Korba (MP) India |
Completed 1985-87 |
|
Fabrication/Erection of pipe Rack Supporting Steel structural with X-Ray quality welding 20% Randum, under EIL supervision total 800MT |
M/s. KRC Works Heavy Water Project, Manuguru (AP) India |
Completed 1984-85 |
|
Structural Stagging Fabrication for Boiling House Equipments, for Hidupur unit 200MT, and Sugar Godown, Roof structural Fabrication and Erection 200MT, Crane Gantry Columns for main factory at Hidupur Unit 250MT, Boiling House Equipment, Erection and Commissioning at Hidupur, 700MT |
M/s. Nizam Sugar Factory Ltd. Under Govt. of India |
Completed 1984-85 |
|
Fabrication at NSF Workshop and Transporting various projects site and Erection testing & commissioning 7 nos of Molasses Storage Tanks as per the relevant Indian Standard |
For various site (AP) State, India |
Completed 1980-85 |
|
Fabrication/Erection Steel Structurals for main Factory Building and Sugar Godown Roof Trusses with Sheeting. |
M/s. Nagarjuna Co-operative Sugar Factory, Guntur Dist. India |
Completed 1984-85 |
|
Erection of complete Boiling House Equipments with sSite Fabrications about 250MT. |
M/s. Thandava Co-operative Sugars Ltd, Visakhapatnam (AP) India |
Completed 1980-81 |
|
Fabrication/Erection of EOT and HOT Cranes Gantry to fabricate with MS Plate Including Rail fixing |
M/s. NSF Miriyalguda (AP) India |
Completed 1976-77 |
|
The complete Boiling House Equipment Erection and Co-generation supplied by Jyothi Ltd; 4.5 MW Baroda, turbineM/s. Willis Morcome Calcutta, Including H.P. and L.P. pipings Steam Line and Processes piping |
M/s. Nandyal Co-Operative Sugars Ltd., (AP) India |
Completed 1976-77 |
|
Fabrication/Erection of Hevay Structurals for NSF, Miriyalguda Total weight: 800MT |
M/s. NSF Miriyalguda (AP) India |
Completed 1975-76 |